重庆枢纽重庆北客运站施工组织方案研究 被引量:3

Study on Construction Organization Plan of Chongqing North Railway Station of Chongqing Hub
下载PDF
导出
摘要 文章针对既有车站改扩建中运输与施工之间的矛盾,通过分析建设期间重庆枢纽客运系统运输组织方案及特点,结合重庆北客运站站场、房建、信号等主要专业工程设计方案,从工程实施难易程度、减少过渡工程、节约工程投资等方面出发,科学合理制定出重庆北客运站施工组织方案。通过现场实施证明,重庆枢纽重庆北客运站施工组织方案不仅满足了重庆枢纽的正常运输,还确保了施工安全和施工进度。 For the contradiction between transportation and construction of existing station, by analyzing the transportation organization plan and character of Chongqing railway hub passenger transportation system during the construction period, combined with Chongqing north railway station yard, house construction, signal and other major engineering design, we study the construction organization plan of Chongqing North Railway Station by taking into account the difficulty of the project implementation, while minimizing the transition project and the investment in engineering. Field data showed that the construction organization of Chongqing north railway station has not only satisfied the normal transportation, but also ensured the construction safety and construction progress.
作者 蔡胜全 罗江成 CAI Shengquan;LUO Jiangcheng(China Railway Eryuan Engineering Group Co. ,Ltd. ,Chengdu 610031 , China)
出处 《高速铁路技术》 2018年第2期61-66,89,共7页 High Speed Railway Technology
关键词 枢纽 客运站 运输组织 施工组织 hub passenger station transportation organization construction organization
  • 相关文献

同被引文献8

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部