期刊文献+

千米深井综放工作面小煤柱护巷参数设计 被引量:1

Narrow Pillar Drift Parameter Design for Fully Mechanized Caving Face with Kilometer Deep Shaft
下载PDF
导出
摘要 针对千米深井强矿压煤层条件巷道支护难题,以新河煤矿3#煤层综放工作面开采实践为基础,模拟分析了宽度为5 m的小煤柱沿空掘巷侧向支承压力及煤柱应力分布规律,分析计算了合理的巷道断面尺寸及支护参数,进行了工作面超前支承压力及小煤柱应力分布规律的现场监测分析。研究结果表明:沿空巷道掘进后小煤柱应力分布呈现两侧压力降低、中间压力增高的趋势,工作面超前支承压力峰值位于工作面前方约20 m处,采空区侧超前支护范围应大于30 m,确定沿空巷道断面尺寸为4.5 m×3.8 m,小煤柱留设尺寸、巷道断面及支护参数满足巷道围岩控制要求。 For kilometer deep roadway support problem, the condition of strong pressure of coal seam 3# coal seam fully-mechanized caving mining in Xinhe coal mine practice as the foundation,the simulation analysis of the small coal pillar width is 5 m roadway driving along gob in lateral abutment pressure and the stress distribution of coal pillar,analysis and calculation of roadway section size and the support parameters,the working face advancing and small coal pillar abutment pressure stress distribution analysis of the field monitoring. Research results show that: after along gob roadway drivage on both sides of the small coal pillar stress distribution in the low pressure, intermediate pressure trend of working face advancing front abutment pressure peak is located in the working face is about 20 m, gob side fore pole range should be greater than 30 m,determine along gob roadway section size is 4.5 m×3.8 m,this small coal pillar size,roadway cross section roadway surrounding rock and supporting parameters meet the control requirements.
作者 马军杰 冯敬伟 孙帅 MA Jun-jie;FENG Jing-wei;SUN Shuai(Shandong Xinhe Mining Co., Ltd., Jining 272400, Chin)
出处 《煤矿机械》 北大核心 2018年第4期8-12,共5页 Coal Mine Machinery
关键词 千米深井 小煤柱护巷 巷道断面 支护参数 矿山压力监测 kilometer deep shaft narrow pillar drift tunnel cross-section support parameter mine pressure monitoring
  • 相关文献

参考文献5

二级参考文献32

共引文献617

同被引文献6

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部