期刊文献+

城镇污水处理厂国家地表Ⅳ类水提标工程设计 被引量:6

Upgrading Design of Municipal Wastewater Treatment Plant for Class Ⅳ of the National Surface Water Standard
下载PDF
导出
摘要 在东源县县城生活污水处理厂一期工程尾水提标工程中,通过采用"曝气生物滤池+高效沉淀池+精密过滤"工艺,出水水质指标由原本的国家《城镇污水处理厂污染物排放标准》(GB18918-2002)一级标准(A标准)提升至国家《地表水环境质量标准》(GB3838-2002)Ⅳ类水体水质标准。详细介绍了尾水提标工程的设计思路、工艺流程、主要构筑物的设计参数及设备配置,并总结了工艺设计特点、经济指标及运行效果,对于同类型污水处理厂的提标改造具有借鉴意义。 In the Upgrading Project of the First Phase of Dongyuan County Municipal WWTP, by adopting the process of"Biological Aerated Filter + Efficient Sedimentation Tank + Precision Filtration", the effluent water quality indicators improve from Class A of the National Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) to Class IV of the National Environmental Quality Standard for Surface Water (GB3838-2002). The Design ideas, process flow, design parameters of main structures, and equipment configuration were introduced in detail. The characteristics of process design, economic indicators, and operation effect were summarized. This project can be used for reference for the upgrading and reconstruction project of the same types of wastewater treatment plant.
作者 李兴 钟毓 苏文越 Li Xing;Zhong Yu;Su Wenyue(Guangdong Environmental Protection Engineering Research and Design Institute Co., Ltd., Guangzhou 510030, China)
出处 《广东化工》 CAS 2018年第7期202-203,173,共3页 Guangdong Chemical Industry
关键词 尾水提标 曝气生物滤池 高效沉淀池 精密过滤 wastewater upgrading project biological aerated filter efficient sedimentation tank precision filtration
  • 相关文献

参考文献7

二级参考文献24

  • 1张诗华,郑俊.曝气生物滤池(BAF)及其设计[J].市政技术,2007,25(4):270-272. 被引量:5
  • 2Pujol R, Tarallo S. Total nitrogen removal in two-step biofiltration[ J]. Water Sci Technol,2000,41 (4 - 5 ) :65 -68.
  • 3Thegerson T, Hanson R. Full scale parallel operation of a biological aerated filter (BAF) and activated sludge (AS) for nitrogen removal [ J ]. Water Sci Technol,2000, 41(4 -5) :159 - 168.
  • 4Pujol R. Process improvements for upflow submerged biofilters [ J ]. Water,2000,32 ( 1 ) : 25 - 29.
  • 5张忠祥 钱易.城市可持续发展与水污染防治对策[M].北京:中国建筑工业出版社,1994.6-7.
  • 6Tom Stephenson,Allan Man and John Upton.The small footprint wastewater treatment process[J].Chemistry&Industry,1993,19:533.
  • 7Payraudeau M and Gilles P.Nitrite removal with biological aerated filters[J].J.Wat.Pollut.Control Fed.,1990,62(2):69.
  • 8David Stensel H et a1.Industrial wastewater treatment with a new biologgieal fixed-film system[J].Environmental progress,1983,2(2):110-114.
  • 9Dillon G R,et a1.A pilot-scale evaluation of the biocarbon process for the treatment of settled sewage and for tertiary nitrification of secondary effluent[J].War.Sci.Tech.,1990,22(1/2):305-361.
  • 10Tschui M,Boiler M,Gujer W,et a1.Tertiary nitrification in aerated pilot biofflters[J].Wat,Sci.Tech.,1994,29(10-11):53~60.

共引文献50

同被引文献45

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部