期刊文献+

综合等待区用于交叉口的优化设计与仿真 被引量:3

Optimization Design and Simulation Application of Integrated Waiting Area at Urban Intersection
下载PDF
导出
摘要 当下城市交叉口优化方面通常采用的方法是设置左转待行区和直行待行区等,但都有其自身的设置条件,对交叉口的几何特征和交通量都有一定的要求。综合等待区是近几年提出的交叉口优化的较新方法,该方法在充分利用道路空间的基础上能间接的增大排队容量并减少了排队长度,降低车辆延误。为更好的优化交叉口的交通状况,对南昌市昌南大道与迎宾北大道交叉口进行实地调查和分析,通过设置综合等待区的方法加以优化设计,并对路口范围道路建模和仿真,最终效果和数据表明综合等待区的设置能较好地提高该交叉口的通行能力和效率,减少延误。 The current approach to optimizing the urban intersections is to set waiting-areas for left-turning and waiting-areas for direct movement,but the two methods have their own setting conditions, and have some requirements for geometric characteristics of the intersections and traffic. The integrated area is a new method for the improvement of the intersections in recent years, which can increase the queuing capacity, shorten the queuing length indirectly, and reduce the vehicle delay on the basis of making full use of the road space. In order to optimize the traffic situation, the site survey and analysis of the intersection of Changnan Road and Yingbin North Road in Nanchang city were carried out. The integrated waiting area was set to optimize the intersection,and the road modeling and simulation were carried out. The research results show that the setting of the integrated waiting area can improve the traffic capacity and efficiency of the intersection and reduce the delay as well.
作者 姚宇 邓明君 Yao Yu;Deng Mingjun(School of Transportation and Logistics, East China Jiaotong University, Nanchang 330013, China)
出处 《华东交通大学学报》 2018年第2期80-88,共9页 Journal of East China Jiaotong University
基金 江西省自然科学基金(20142BAB201015) 江西省教育厅科研项目(GJJ160476)
关键词 交通整治 交叉口优化 综合等待区 平均延误 VISSIM微观仿真 traffic remediation intersection optimization integrated waiting area average delay VISSIM micro simulation
  • 相关文献

参考文献6

二级参考文献48

共引文献35

同被引文献42

引证文献3

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部