摘要
随着矿山开采逐步发展,井工开采会对边坡原有平衡状态造成破坏,从而使边坡稳定性降低,在此基础上采用相似模拟试验对复合采动下采动边坡变形破坏进行研究。研究结果表明:在井工开采掘进情况下,4~#矿层的初步来压步距、垮落高度、垮落角,还有9~#矿层的初步来压步距、垮落高度、垮落角,符合实际工程状况;随着4~#矿层采掘长度的加大,坡体内部覆岩在不同作用力下沉降也在不断加大;随着9~#矿层采掘长度的不断加大,坡体沉降和塌陷也在不断加大。
With the gradual development of mining, the underground mining will destroy the original equilibrium state of the slope and to reduce the stability of slope. On the basis of this, a similar simulation test is used to study the deformation and failure of the mining slope under the composite mining. The results show that: in the case of underground mining and excavating, the initial pressure step, the collapse height, the collapse angle in 4# seam, and the initial pressure step, the collapse height, the collapse angle in 9# seam accord with actual project condition. With the increase of the mining length of the 4# seam, the sedimentation of the internal overburden of the slope is also increased under different force; with the continuous increase of the mining length of the 9# seam, the subsidence and collapse of the slope are also increased.
作者
王创业
李俊鹏
刘伟
张琪
WANG Chuangye;LI Junpeng;LIU Wei;ZHANG Qi(Institute of Mining, Inner Mongolia University of Science and Technology, Baotou 014010, China)
出处
《煤矿安全》
CAS
北大核心
2018年第4期58-60,64,共4页
Safety in Coal Mines
基金
国家自然科学基金资助项目(51464036
51564048)
关键词
相似模拟
复合采动
变形破坏
初次来压
来压步距
similar simulation
composite mining
deformation damage
first weighting
step distance