期刊文献+

关于酸性矿井水提标改造工艺方案的比选 被引量:2

Comparison and Selection of the Technical Solutions on the Standard Improvement and Reconstruction of Acid Mine Water
下载PDF
导出
摘要 多数矿井现有的处理工艺不能满足要求,需要提标改造,针对山西省矿井普遍存在的问题,进行方案比选,以期为现有矿井提标改造提供参考。 With the release of The Water Pollution Control Plan and more attention put on the environmental protection by the local governments,the Coal Mine Water become the key point of water pollution prevention and control in Shanxi Province while Shanxi is a major coal-producing province.Most mine water cannot be fully utilized and discharged after processing,so the government of Shanxi province requires that the emission standard of the coal mine water must reach the third class standard of surface water environmental quality.In view of the common problems of the mines in Shanxi province,it is found that most existing treatment processes do not meet the requirements and need to start the Standard Improvement and Reconstruction plan,which will compare and select technical solutions in order to provide reference for the existing mines.
作者 马双提 马宏 MA Shuangti;MA Hong(Lvliang Environmental Science Research Institute, Lvliang 033000, China;Beijing Institute of Hydrogeology and Engineering Geology, Beijing 100195, China)
出处 《环境与可持续发展》 2018年第2期156-158,共3页 Environment and Sustainable Development
关键词 矿井水 提标改造 比选 mine water standard improvement and reconstruction plan comparison and selection of technical solutions
  • 相关文献

参考文献4

二级参考文献14

共引文献9

同被引文献11

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部