摘要 在市政桥梁施工过程中,跨越既有线路的桥梁上部结构施工通常需要根据被跨道路和新建桥梁的位置关系及被跨线路的通行要求选择适当的施工工艺。通过针对上跨高速道路的桥梁上部结构吊装施工工艺进行探讨,对桥梁拼装施工过程中架桥机拼装、过孔、中边梁架设及施工中安全防护措施等方面进行论述。 In the process of municipal bridge construction, the construction of the superstructure of the bridge across the existing lines usuaIly needs to select the appropriate construction technology according to the position relationship of the cross-roads and the new bridges and the requirements of the cross-line crossing. Mainly for the construction of bridge superstructure on the highway across the road to discuss the construction process, mainly from the bridge assembly process erecting machine assembly, through hole, the side beam erection and construction of safety precautions and other aspects of the discussion.
作者 周亮 Zhou Liang
出处 《建筑技术开发》 2018年第7期61-62,共2页 Building Technology Development
关键词 跨高速道路 预制箱梁 吊装施工 crossing expressway prefabricated box girder hoisting technology
  • 相关文献

参考文献1

二级参考文献1

共引文献26

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部