期刊文献+

重力铸造铝合金前副车架纵梁铸件 被引量:4

Gravity Casting Aluminum Alloy Front Sub-frame Side Beam Casting
原文传递
导出
摘要 对Al-7Si-0.3Mg铝合金中空结构前副车架纵梁铸件的结构进行优化设计,采用重力铸造生产纵梁铸件,并通过数值模拟技术调整优化工艺参数,使用探伤机、万能试验机等手段研究铸件内部品质及力学性能。结果表明,生产的纵梁铸件完全满足相关标准要求。 Al-7 Si-0.3 Mg aluminum-alloy front sub-frames side beam with hollow structure was designed.Through optimizing the product structure design,gravity casting technology was adopted,and the process parameters were optimized by numerical simulation.In addition,internal quality and mechanical properties of the castings were analyzed by X-ray detector and universal tester.The results reveal that the gravity casting aluminum alloy sub-frame side beam casting can meet fully the standard requirement.
作者 苏为强 李云翔 Su Weiqiang;Li Yunxiang(Hubei Hangte)
出处 《特种铸造及有色合金》 CAS CSCD 北大核心 2018年第4期388-390,共3页 Special Casting & Nonferrous Alloys
关键词 前副车架纵梁 重力铸造 铝合金 数值模拟 Front Sub-frame Side Beam, Gravity Casting, Aluminum Alloy, Numerical Simulation
  • 相关文献

参考文献3

二级参考文献12

共引文献55

同被引文献33

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部