摘要 以南京长江第五大桥夹江隧道明挖段基坑降水为工程背景,针对南京长江漫滩地区上部粘性土层为软土层与硬土成互层结构,在软土层中夹有粉细砂层透镜体,下部砂层的厚度较大(3~40m),为承压含水层等特点,采用Visual MODFLOW软件建立多层含水层地下水模型,提出了合理的深基坑降水方案。 The engineering background is the excavation section of the Jiajiang tunnel in the Nanjing Yangtze River Bridge No.5. The upper clay soil layer in the Yangtze River floodplain area in Nanjing is an interbedded layer of soft soil and hard soil, with fine powder in the soft soil layer. Sand lens body, the thickness of the lower sand layer(3 ~ 40 m), is a confined aquifer and other characteristics, the use of Visual MODFLOW software to establish a multi-layer aquifer groundwater model, put forward a reasonable deep-pit dewatering program.
作者 吴奎 WU Kui(China Railway 14th Construction Bureau Large Shield Project Co., Ltd., Nanjing 211899, China)
出处 《价值工程》 2018年第15期129-131,共3页 Value Engineering
关键词 深基坑降水 VISUAL MODFLOW 长江漫滩 deep foundation pit dewatering Visual MODFLOW the Yangtze River floodplain
  • 相关文献

参考文献8

二级参考文献28

共引文献117

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部