西气东输二线工程作为我国天然气四大进口战略通道中的西北通道,在全国天然气管网布局中最具战略意义.作为管道施工企业经营管理人员,全程参与了干线及支干线某标段的线路、水保、站场工程的投标、施工、结算管理,项目整体结算效果达到预期,工程经济效益比较良好,工程全生命周期跨度近9年,归纳总结施工企业的承包合同结算管理经验,仅供大家借鉴.
West to East Gas Pipeline Project II had the most strategic significance as the northwest access of four gas import strategic accesses of China. As a business management staff of pipeline construc-tion enterprises, the authors participated in the management of bidding, construction and settle-ment of mainline, soil protection, station construction of trunk line and branch lines. The overall settlement effect of the project is expected with relative good economic benefit, the overall project life cycle span of nearly 9 years is obtained. It provides reference of the contract settlement man-agement experience for construction enterprise.
作者
史洋
马赛
谭淑艳
杨婕
程慧
Yang Shi;Sai Ma;Shuyan Tan;Jie Yang;Hui Cheng(No. 4 Branch Company of China Petroleum Pipeline Engineering Co. Ltd., Langfang Hebe)
出处
《石油天然气学报》
CAS
2018年第2期20-23,共4页
Journal of Oil and Gas Technology
关键词
结算管理
竣工资料
变更签证
索赔
甲供材料
Settlement Management, Project Completion Data, Visa of Alternation, Claim, Materials Provided by Owner