摘要 结合陕京四线怀九河顶管隧道施工工程,深入剖析了长输油气管道岩石顶管隧道施工过程中的潜在风险,根据各种风险存在的特点,制定了一套详细且行之有效的应对措施,以期为今后长输油气管道岩石顶管隧道施工风险规避提供借鉴和参考. In this paper, combined with the Shanxi-Beijing Four-line bosom Huaijiuhe Pipe-jacking Tunnel Construction Project, the potential risks existed in the process of rock tunnel pipe jacking con-struction of long distance oil and gas pipelines were analyzed in depth. A set of countermeasures are developed based on characteristics of various risks, it provides reference for avoiding risks in rock tunnel pipe jacking construction of long distance oil and gas pipelines in the future.
作者 刘小林 郅永强 高国庆 王玉涛 蔡文虎 Xiaolin Liu;Yongqiang Zhi;Guoqing Gao;Yutao Wang;Wenhu Cai(No. 4 Branch Company of China Petroleum Pipeline Engineering Co. Ltd., Langfang Hebe)
出处 《石油天然气学报》 CAS 2018年第2期59-62,共4页 Journal of Oil and Gas Technology
关键词 长输油气管道 岩石顶管 安全风险 应对措施 Long Distance Oil and Gas Pipelines, Rock Pipe Jacking, Safety Risk, Countermeasure
  • 相关文献

参考文献1

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部