大断面岩巷快速掘进新技术的研究与应用 被引量:3

Study on new technology for rapid excavation of large section rock roadway
下载PDF
导出
摘要 近年来,长距离大断面副平硐设计成为矿山建设企业的首选方案,但受地质条件、作业空间、技术装备的限制,生产系统复杂、人员劳动强度大、巷道施工速度慢,不仅安全管理困难,而且严重制约高产高效矿井主要生产系统的形成。针对这一问题,丁家渠煤矿提出了中深孔全断面光面爆破法、防爆装载机装矸、自卸式防爆汽车排矸的新型掘进施工法,与传统光面爆破法、耙矸机配合皮带排矸的施工方法相比,极大地简化了生产作业系统、降低了劳动强度、减少了当班入井人数、降低了安全管理的难度、加快了巷道的施工速度,成为一种安全、高效的快速掘进施工技术。 In recent years,long distance and large section vice adit design become the preferred solution for mine construction enterprise,but by the geological conditions,working space,equipment limitations,complex manufacturing system,staff labor intensity,slow speed of tunnel construction safety management,not only difficult,but also seriously hampered the formation of the main production system of coal mine. To solve this problem,Ding proposed mine drainage hole full section smooth blasting,rock loading and unloading explosion-proof loader type explosion-proof car dumping new tunneling method,compared with the traditional smooth blasting method,rake machine with the construction method of gangue belt,greatly simplifies the production operation system,reduce the labor intensity,reduce the number of on duty well and reduce the difficulty of safety management,accelerate the construction speed of roadway,a rapid excavation technique for safe and efficient.
作者 郭翔 GUO Xiang;
出处 《内蒙古煤炭经济》 2018年第6期1-2,共2页 Inner Mongolia Coal Economy
关键词 大断面 全岩巷 快速掘进 新技术 Large section Full rock roadway Fast tunneling New technology
  • 相关文献

参考文献3

二级参考文献2

  • 1胡峰.井巷快速光爆的初步研究与试验[M].北京:科学技术文献出版社,1980.63-80.
  • 2Chen Shihai.Parameter Design of Cut-hole in Proceedings of ICEBT95.北京:中国人民大学出版社,1995.

共引文献22

同被引文献10

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部