期刊文献+

基于碳排放测算的工业化建筑全产业链阶段划分研究 被引量:1

Research on phase division of industrialized building's industrial chain based on carbon emissions accounting
下载PDF
导出
摘要 碳排放测算方法和碳排放因子的选择、全产业链阶段划分情况都对工业化建筑的碳排放测算有着重要影响。以量化工业化建筑碳排放为目的,从建筑的碳排放测算方法着手并以此作为划分基础,对碳排放测算方法、碳排放因子进行整理分析,并调研、归纳国内外工业化建筑全产业链的阶段划分现状析,总结出了一种较适用于现阶段我国工业化建筑的全产业链阶段划分方法,即构件生产阶段、运输阶段、建造(或施工)阶段、使用(包括维护)阶段、拆除及回收阶段五部分。 The selection of carbon emissions’ measurement method and carbon emission factors, and the phase division of industrialized chain, have an important influence on carbon emissions accounting. To quantify industrialized buildings ’ carbon emissions for the purpose, the article starts from the carbon emissions ’ measurement method and use it as the foundation. After making a study of the phase division actuality of worldwide industrialized buildings ’ whole industrial chain, the article summarizes a suitable dividing method of the phase division of China’ s industrialized building ’ s industrial chain namely five parts as component production, transportation, construction, operation, maintenance and demolition.
作者 尚雁雯 陈伟娇 苑翔 乔春珍 SHANG Yan-wen;CHEN Wei-jiao;YUAN Xiang;et al
出处 《节能》 2018年第4期64-67,共4页 Energy Conservation
基金 国家重点研发计划项目(项目编号:2016YFC0701807)
关键词 工业化建筑 碳排放测算 全产业链 阶段划分 industrialized building carbon emissions accounting the whole industrial chain phase division
  • 相关文献

参考文献8

二级参考文献106

共引文献335

同被引文献6

引证文献1

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部