摘要 双曲拱坝是一种可靠安全、经济合理的坝型,在设计时,坝肩的稳定性是坝体设计和施工时需要重点考虑的问题。本文以八峰水库工程为例,通过构建三维地质模型,模拟了双曲拱坝开挖和浇筑过程中的稳定性,然后根据模拟结果分析了坝肩岩体浇筑和开挖过程中应力变形情况,保证了双曲拱坝施工的稳定性,可为类似工程提供借鉴。 Double Curvature arch dam is a reliable,safe,economical and rational dam type. In design,the stability of the dam abutment is the key considered during dam design and construction. In the paper,Bafeng Reservoir Project is adopted as an example. The stability in double curvature arch dam excavation and pouring is simulated. Then,the stress deformation condition in dam abutment rock pouring and excavation is analyzed according to the simulation results,thereby ensuring the stability of double curvature arch dam construction,and providing reference for similar projects.
作者 王芳 WANG Fang(Fujian Jinyu Construction Engineering Co.,Ltd., Ningde 352100, China)
出处 《中国水能及电气化》 2018年第4期22-24,17,共4页 China Water Power & Electrification
关键词 双曲拱坝 稳定性 控制 double curvature arch dam stability control
  • 相关文献

参考文献4

二级参考文献17

  • 1林海泉,刘秋英,佘成学.单江拱坝右坝肩岩体变形稳定计算分析[J].岩土力学,2005,26(2):319-322. 被引量:2
  • 2张宜虎,尹红梅,王亮清.鱼简河拱坝坝肩岩体稳定性分析[J].岩石力学与工程学报,2005,24(18):3305-3310. 被引量:6
  • 3SL282-2003.混凝土拱坝设计规范[s].中华人民共和国水利部,2003.6.
  • 4[7]LIN J,FENG X T,DING X L,et al.Stability assessment of the Three Gorges Dam foundation,China,using physical and numerical modeling-part Ⅰ:physical model tests[J].International Journal of Rock Mechanics and Mining Sciences,2003,40(2):609-631.
  • 5[8]LIU X Q,ZHANG L,CHEN J Y,et al.Geomechanical model test study on stability of concrete arch dam[C]//MARTIN W,REN Q W,JOHN S Y ed.Proceedings of the 4th International Conference on Dam Engineering.London:A.A.Balkema,2004:557-562.
  • 6[9]CHENY,ZHANGL,HEXS,et al.Evaluation of model similarity of induced joints in a high RCC arch dam[C]//Physical Modelling in Geotechnics-6th ICPMG.[S.L.]:[s.N.],2006:413-417.
  • 7[10]HE X S,ZHANG L,CHEN Y,et al.Stability study of abutment of Jinping-Ⅰ arch dam by geomechanical model test[C]// Physical Modelling in Geotechnics-6th ICPMG.[S.l.]:[s.n.],2006:419-423.
  • 8[14]ZHANG L,LI C G,CHEN X,et al.Application of new modelling technique in Pudding,Shapai RCC arch dam[C]// International Symposium on Roller Compacted Concrete Dam,APR.[S.l.]:[s.n.],1999:578-582.
  • 9中华人民共和国行业标准编写组.SL282-2003混凝土拱坝设计规范[S].北京:中国水利水电出版社,2003.
  • 10YU X, ZHOU Y F, PENG S Z. Stability analyses of dam abutments by 3D elasto-plastic finite-element method: a case study of Houhe gravity-arch dam in China[J]. International Journal of Rock Mechanics and Mining Sciences, 2005, 42(3): 415-430.

共引文献62

同被引文献7

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部