期刊文献+

基于工程量清单计价模式下的施工合同管理研究 被引量:3

Research on Construction Contract Management Based on Bill of Quantities Pricing Model
下载PDF
导出
摘要 随着经济社会的日益发展,房建项目工程量越来越大,施工技术急需优化、管理精细化水平更需要提升。文章基于工程量清单计价这个模式,介绍了施工合同控制现状,详细阐述了施工合同管理于投标、签订、落实、索赔过程存在的不足及相关处理措施。 With the economic and social development,the project volume of the housing construction project is getting bigger and bigger.The construction technology needs to be optimized urgently,and the level of refined management needs to be improved.Based on the model of bill of quantities calculation,the article introduces the current status of construction contract control,and elaborates on the inadequacies of the construction contract management in the tendering,signing,implementation,and claims processes and related measures.
作者 吕芳芳 鲁永苍 LU Fang-fang;LU Yong-cang(China Nuclear Power Engineering Co., Ltd., Beijing 100089, China)
出处 《科技视界》 2018年第7期246-247,217,共3页 Science & Technology Vision
关键词 工程量清单 计价模式 施工合同 Bill of quantities Pricing model Construction contract
  • 相关文献

参考文献2

二级参考文献2

共引文献1

同被引文献4

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部