摘要 针对重载铁路高填方路基施工技术研究,将以山西中南部铁路通道ZNTJ-20标重载铁路高填方路基填筑工程为案例,从工程概况分析入手,结合路基填料选择和填筑工艺试验,对路堤施工工艺及控制要点展开论述。最后,论文基于工后沉降观测结果,总结了重载铁路高填路堤的施工经验。 In view of construction technology of high-fill roadbed of heavy haul railway, taking the high-fill subgrade project of heavy haul railway in ZNTJ-20 section of the railway in south central of Shanxi, paper analyzes the project profile, combing with the selection of fill, and the filling process test, discusses the construction technology and control points of roadbed construction, finally, paper summerizes the specific experience of high-fill roadbed construction of heavy railway based on the observed result of post-construction settlement.
作者 赵洪强 ZHAO Hong-qiang(China Railway 17th Bureau Group No.5 Engineering Co. Ltd., Taiyuan 030000, China)
出处 《工程建设与设计》 2018年第8期65-66,共2页 Construction & Design for Engineering
关键词 重载铁路 施工技术 填筑工艺 高填方 overloaded railway construction technology filling process high filling
  • 相关文献

参考文献1

二级参考文献10

共引文献5

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部