针对重载铁路高填方路基施工技术研究,将以山西中南部铁路通道ZNTJ-20标重载铁路高填方路基填筑工程为案例,从工程概况分析入手,结合路基填料选择和填筑工艺试验,对路堤施工工艺及控制要点展开论述。最后,论文基于工后沉降观测结果,总结了重载铁路高填路堤的施工经验。
In view of construction technology of high-fill roadbed of heavy haul railway, taking the high-fill subgrade project of heavy haul railway in ZNTJ-20 section of the railway in south central of Shanxi, paper analyzes the project profile, combing with the selection of fill, and the filling process test, discusses the construction technology and control points of roadbed construction, finally, paper summerizes the specific experience of high-fill roadbed construction of heavy railway based on the observed result of post-construction settlement.
作者
赵洪强
ZHAO Hong-qiang(China Railway 17th Bureau Group No.5 Engineering Co. Ltd., Taiyuan 030000, China)
出处
《工程建设与设计》
2018年第8期65-66,共2页
Construction & Design for Engineering
关键词
重载铁路
施工技术
填筑工艺
高填方
overloaded railway
construction technology
filling process
high filling