变截面空心薄壁墩悬臂爬模施工技术分析 被引量:3

Construction Technology Analysis of Cantilever Climbing Formwork for Hollow Thin-Walled Pier with Variable Cross-Section
下载PDF
导出
摘要 在桥梁建设中,为了保证桥梁的施工质量,实现经济效益最大化,通常会采用悬臂爬模施工技术。基于此,论文从悬臂爬模组成和其具有的优势入手,结合工程实例,对变截面薄壁空心高墩施工技术及质量控制进行分析。 In order to ensure the quality of bridge construction and realize the maximization of economic benefits, cantilever climbing mode construction technology is usually used in bridge construction. Based on this, this paper combining with project example, analyzes the construction technology and quality control of the thin-walled hollow high pier with variable cross-section, starting from the composition of cantilever climbing model and its advantages.
作者 王许峰 WANG Xu-feng(CCCC Tunnel Engineering Company Limited, Beijing 100000, China)
出处 《工程建设与设计》 2018年第8期179-180,共2页 Construction & Design for Engineering
关键词 变截面 空心薄壁墩 悬臂爬模 施工技术 variable section hollow thin wall pier cantilever climbing mode construction technology
  • 相关文献

参考文献1

共引文献2

同被引文献10

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部