摘要
以某企业燃煤锅炉供汽改建为蒸汽管道供汽项目为例,从施工期、运营期及环境风险三个方面对项目建设造成的环境影响进行分析,使公众对蒸汽管线施工过程有大致的了解,从而更好地推进环评工作。
Taking the alteration of steam supply from coal-fired boiler to steam pipeline in an enterprise as a case study.To analyze the environmental impact of the project construction in the three aspects of construction period and operational period and environmental risk.The aim of this article is to make the public have a general understanding of the process of steam pipeline construction and so as to better promote the eia work.
作者
刘慢
荣伟英
LIU Man;RONG Wei-ying(CNOOC Tianjin Chemical Research & Design Institute Co. Ltd., Tianjin 300131, China;Ier Environment Protection Engineering Technique Co.Ltd., Shenzhen 518071, China)
出处
《安徽化工》
CAS
2018年第2期100-103,共4页
Anhui Chemical Industry
关键词
蒸汽管线
施工期
运营期
环境风险
steam pipeline
construction period
operational period
environmental risk