摘要 以青岛地铁1号线过海区间为工程背景,采用地质分析、工程类比和综合比选的方法,分析硬岩地层长距离过海地铁区间的施工方法。研究表明,适合硬岩地层过海地铁区间隧道的工法包括钻爆法和TBM工法,结合工程和水文地质条件,从断面、地层、不良地质安全风险、工期和投资等方面进行加权综合比选。青岛地铁1号线过海区间适合采用钻爆法单洞双线方案。 On the background of Qingdao line No. 1 subsea tunnel,construction method selection of long subway subsea tunnel are analyzed by geological analysis, engineering analogy and comprehensive comparison. It is concluded that drill blasting method and TBM method are suitable for hard rock,construction method should be chosen from the aspects of section,stratum,unfavorable geology security risk,conbined with engineering and hydrogeological conditions,construction period and cost analysis.Qingdao line No. 1 subsea tunnel is suitable for drilling and blasting method with single hole double line program.
作者 宋超业 贺维国 刘鹏 SONG Chaoye;HE Weiguo;LIU Peng(China Railway Tunnel Survey & Design Institute Co. , Ltd. , Tianjin 300133, China;Enterprise Key Laboratory of Tunnel Design and Safety Assessment, Tianfin 300133, China)
出处 《施工技术》 CAS 2018年第8期69-74,共6页 Construction Technology
基金 中国中铁科技开发计划资助项目(2016重大08)
关键词 硬岩地层 地铁 隧道 施工工法 分析 hard rock stratum subways tunnels construction analysis
  • 相关文献

参考文献7

二级参考文献58

共引文献494

同被引文献13

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部