摘要
确定了临沂±800 k V换流站与智圣500 k V变电站两站合建后的二次系统设计方案。对合建后的二次系统设计进行描述,结合两站建设时序提出过渡阶段二次系统的设计方案。
The secondary system design scheme of Linyi ±800 k V converter station and Zhisheng 500 k V substation is established.The combined construction secondary system design is described.Combined with the timing of the construction of the two stations,the design scheme of the secondary system in the transition phase is proposed.
作者
倪佳伟
申永成
苏斌
苏炜
王帅
NI Jiawei;SHEN Yongcheng;SU Bin;SU Wei;WANG Shuai(East China Electric Power Design Institute Co.,Ltd.,Shanghai 200001 ,China;State Grid Shandong Electric Power Company,Jinan 250001, China;Economic & Technology Research Institute,State Grid Shandong Eleetrie Power Company,Jinan 250021, China;State Grid Qingzhou Power Supply Company,Weifang 262500, China)
出处
《山东电力技术》
2018年第3期43-47,共5页
Shandong Electric Power
关键词
电气工程
±800
kV换流站
二次系统
合建
electrical engineering
±800 kV converter station
secondary system
combined construction