期刊文献+

麦积区席子沟流域淤地坝工程施工设计 被引量:3

Warping Dam Project Construction Design on Xizigully Basin of Maiji District
下载PDF
导出
摘要 文章依据麦积区席子沟流域治理现状及规划,在分析麦积区席子沟流域地形自然状况、社会经济状况、流域水文气象、拟建工程情况的基础上,阐述了麦积区席子沟流域淤地坝工程施工设计的水文计算、设计标准、设计洪峰流量、设计洪水总量的计算及工程设计的工程布设库容及坝高断面确定、溢洪道工程设计、护坡、坝基和岸坡处理等。 According to Xizigully basin of Maiji district management present situation and planning,based on the analysis of Xizigully basin of Maiji district watershed topography and natural condition,social economic conditions,hydrologic meteorological,on the basis of the situation of the proposed construction project,this paper expounds Xizigully basin of Maiji district warping dam engineering construction design of hydrological calculation,design standards,design flood peak discharge and flood volume calculation and engineering design of layout of capacity and high dam,spillway dam and dam foundation and engineering, slope protection,bank slope treatment etc.
作者 温爱存
出处 《中国建材科技》 2018年第2期113-115,共3页 China Building Materials Science & Technology
关键词 麦积区 席子沟流域 淤地坝 Maiji District Xizigully Basin Warping Dam
  • 相关文献

参考文献2

二级参考文献7

  • 1《水土保持治沟骨干工程暂行技术规范》(SD175-86)[S].
  • 2《淤地坝工程技术规范》(晋Q834-85)[S].
  • 3《水利经济计算规范)(SD139-85)[S].
  • 4郭文元 穆天亮.关于淤地坝设计洪水标准确定方法的探讨.山西水土保持科技,1986,(4):15-18.
  • 5聂兴山,许国平,郭文元.晋西王家沟流域坝地发展灰色预测[C]//晋西淤地坝试验研究文集,郑州:黄河水利出版社,2000:180-185.
  • 6郭文元 李如鸿.淤地坝工程有关问题探讨.山西水土保持科技,1985,(3):12-18.
  • 7穆天亮,郭文元.淤地坝枢纽结构的选择和溢洪道最佳宽度的确定[J].水土保持学报,1990,4(2):19-25. 被引量:3

共引文献2

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部