摘要
本文根据该项工程实际情况和相关技术标准、水文地质特征,对施工准备、测量放线、基坑开挖、挡土墙施工、基坑监测等关键部分进行深入研究。
Based on the actual situation of the project and related technical standards and hydrogeological characteristics, the key parts of construction preparation, surveying and laying out, excavation, retaining wall construction and foundation pit monitoring are studied in depth.
出处
《中国建材科技》
2018年第2期143-143,161,共2页
China Building Materials Science & Technology
关键词
桥梁深基坑
综合防护施工
挡土墙施工
deep foundation pit of bridge
comprehensive protection construction
retaining wall construction