摘要
采用柱塞泵替代电动给水泵对锅炉A修后进行打压,不仅降低了对机侧系统的依赖程度,还节省了厂用电、提高了电动给水泵安全性。
Using piston pump to replace electrically driven feed-water pump in uhra-supercritical boiler after class-A repair, which not only reduces the dependence on side system, but also saves the auxiliary power and improves the security of electrically driven feed-water pump.
作者
余波
Yu Bo(Shenzhen Energy Hopewell Power(Heyuan) Co., Ltd., Heyuan 517000, China)
出处
《锅炉制造》
2018年第3期25-26,共2页
Boiler Manufacturing
关键词
水压试验
柱塞泵
耗电量
hydrostatic test
piston pump
power consumption