摘要
随着环保排放要求的日益严格,对运行机组污染物排放时均超标值的考核时段是从发电机并网起至发电机解列,所以必须实现全负荷脱销运行,以满足要求。
With the increasingly stringent requirements of environmental protection emissions, the check period for pollutant emissions of operating units is from generator grid - connected to generator decoupling, so full load off-sale operation must be realized in order to meet the requirements.
作者
李锦斌
Li Jinbin(Guangdong Jinghai Power Co., Ltd., Huilai 515223 ,China)
出处
《锅炉制造》
2018年第3期37-39,共3页
Boiler Manufacturing