本文主要介绍EPC模式下大型充填砂袋筑堤项目的进度目标控制。充分发挥EPC总承包方的优势对项目的进度目标进行分解,综合各方资源对进度目标的可行性进度分析,施工过程中对进度目标进行有效的控制。对EPC模式下大型充填砂袋快速筑堤主要的管理经验进行分析总结,为后续工程提供参考。
An introduction to the schedule target control is made in detail, which is applicable for the embankment built with large sand bags in EPC mode. It is necessary to resolve the schedule targets into different parts, integrate all resources for the feasibility analysis, and effectively control the schedule objectives during the construction by giving full play to the advantages of EPC general contractor. The above management experiences are analyzed and summarized, which will provide a reference for further projects.