期刊文献+

矿井建设综合取热研究

Study on Comprehensive Heat Removal in Mine Construction
下载PDF
导出
摘要 根据国家可持续发展经济的要求和节能环保设计典范,思考矿井建设当中采暖设计的一些新想法、新思路。针对七元矿井实际供热情况和分时段供热量要求,对项目建设供热设计提出自己的一些想法和建议,供热主要以地热直接取热,地下水热泵取热,乏风取热和瓦斯利用取热三种环保取热方式,以满足七元矿井不同建设阶段的供热要求。 According to the requirements of the national sustainable development economy and the model of energy-saving and environmental protection design, we think about some new ideas and new ideas of heating design in mine construction. This paper puts forward some ideas and suggestions for the heat supply design of the project construction. The main heating methods are geothermal direct heating, groundwater heat pump heating, spent wind heat recovery and gas utilization heat recovery. In order to meet the requirements of heating in different construction stages of Qiyuan Mine.
作者 贾永忠 Jia Yongzhong(Qiyuan Coal Mine Co., Ltd., Shouyang Jinzhong 04540)
出处 《机械管理开发》 2018年第4期117-119,共3页 Mechanical Management and Development
关键词 矿井建设 供暖 热泵 节能环保 mine construction heating heat pump energy saving and environmental protection
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部