高效吸收塔在硫酸装置干吸工序中的应用

Application of high efficient absorption tower in drying-absorption section of sulphuric acid plant
下载PDF
导出
摘要 针对云南铜业股份有限公司硫酸装置干吸工序一吸塔在生产过程中出现漏酸的问题,在不能停产且场地受限的情况下,技术人员异地新建高效吸收塔取代原一吸塔。改造后,高效吸收塔运行情况良好,解决了因一吸塔漏酸引起的安全隐患及非计划停产,为装置长周期稳定运行提供了保障。 Concerning the issue of leakage of sulphuric acid of the first absorption tower of drying-absorption section of sulphuric acid plant in Yunnan Copper Corporation during production,under the conditions which production can't be shut down and the site space is limited,technicians newly built a high efficient absorption tower in another location replacing the original first absorption tower.After the modification,the high efficient absorption tower runs very well,solving the issues of potential safety hazard and non-planning shutdown caused by leakage of sulphuric acid of the first absorption tower,providing the security of long and stable operation of sulphuric acid plant.
作者 李琼 LI Qiong(Yunnan Copper Co., Ltd., Southwest Copper Company,Kunming,Yunnan,650102,China)
出处 《硫酸工业》 CAS 2018年第2期51-53,共3页 Sulphuric Acid Industry
关键词 硫酸装置 吸收塔 干吸工序 二氧化硫 应用 sulphuric acid plant absorption tower drying-absorption section sulphur dioxide application
  • 相关文献

参考文献2

二级参考文献1

  • 1肖世猛,郑建国.阳极保护不锈钢浓硫酸冷却器、分酸器、管道[A].中外防腐蚀和分离工程新技术新产品应用推广大会专集[C].北京:中国工业防腐蚀技术协会,2004,10.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部