摘要
以石油工程类项目为例,讨论施工进度的计划与控制问题,着重讨论石油工程类项目施工从计划到实施、检查、改进的动态控制,对石油工程类项目施工进度的控制方法进行了必要的总结。
As one of three major control objectives of project,progress schedule,which seemingly tied up with quality and budgeting control,however,in reality these two factors change over time and are also related to the progress. This paper focuses on the dynamic control of petroleμm engineering projects construction from planning to implementation,inspection,improvement and it also sμmmarized the control methods of progress of petroleμm engineering projects.
作者
惠文婷
王晓娟
李磊
徐睿军
Hui Wenting;Wang Xiaojuan;Li Lei;Xu Ruijun(School of Economics and Management of Xi’an Shiyou university,Xi’an 710065,Shaanxi,China;Huangling Exploration and Development Project Headquarters of Yanchang Oilfield Co. Ltd.,Huangling 727300,China;School of earth sciences and engineering,Xi’an Shiyou university,Xi’an 710065,Shaanxi,China)
出处
《云南化工》
CAS
2018年第4期143-144,共2页
Yunnan Chemical Technology
关键词
石油工程类项目
进度控制
施工进度
控制方法
petroleμm engineering projects
progress control
construction schedule
control method