期刊文献+

地铁岛式车站后设计过渡性地下检修库功能探索

Design of suburban underground maintenance station after design of metro island station
下载PDF
导出
摘要 特殊条件下某期地铁工程不能同期建设属于自己的车辆基地,从地铁总体设计角度出发研究,通过线网间车辆基地资源共享和地下2层岛式车站后利用故障车停车线设置过渡性工程地下检修库的探索来满足过渡期地铁车辆运用、检修的要求,通过实际案例分享地下检修库的设计方案、难点和经验。 Under certain conditions,a certain subway project can not build its own vehicle base in the same period. The author studies the overall design of the subway,sets up the transitional project through the resource sharing of the inter-depot vehicle base and the parking lane of the broken-down bus in the underground two-exploration of underground maintenance depot to meet the requirements of transitional subway vehicle operation and maintenance,and to share the design,difficulties,experiences and lessons of underground maintenance depot through actual cases.
作者 李德胜
出处 《山西建筑》 2018年第11期10-12,共3页 Shanxi Architecture
关键词 地铁 过渡性工程 地下检修库 subway, transitional engineering, underground maintenance library
  • 相关文献

参考文献1

二级参考文献3

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部