摘要
在简要介绍振动噪声来源、传播路径和总结轨道减振降噪措施的基础上,结合佛山2号线车辆段工程实例,对车辆段设计建设阶段和运营维护阶段综合减振降噪措施进行探讨,为相关工程提供参考。
Based on a brief introduction of the vibration and noise sources,transmission path,and the summary of vibration reduction and noise reduction measures for the track,combined with the engineering example of the depot of the Foshan metro line 2,the comprehensive measures for vibration reduction and noise reduction during the design and construction phase and operation and maintenance phase of the depot are discussed,provide reference for related projects.
出处
《山西建筑》
2018年第11期162-164,共3页
Shanxi Architecture
关键词
地铁车辆段
轨道
综合减振降噪措施
metro depot, track, comprehensive vibration and noise reduction measures