地铁地下工程的不确定性决定了造价工作的复杂性,在合作共赢基础上顺利完成地铁建设尤其重要。阐述了地铁工程爆破降效补偿造价难题的解决过程,提出了较为可行的工作方案,希望对同行处理同类问题以有意的启发。
The uncertainty of subway underground works determines the complexity of the cost work. It is especially important to successfully complete the subway construction on the basis of cooperation and win-win cooperation. This paper expounds the solving process of the cost reduction problem of the subway engineering blasting effect reduction,and puts forward a feasible work plan,hoping to enlighten the colleagues to deal with similar problems.
出处
《山西建筑》
2018年第11期231-232,共2页
Shanxi Architecture
关键词
地铁工程
临近建(构)筑物
爆破施工