摘要
在金属矿生产当中,经常会出现在完成回采之后、在充填接顶方面存在困难的情况,并因此导致局部冒顶以及片帮等问题的出现。在本文中,将就水平分层充填采矿法采场接顶充填方案进行一定的研究。
in the production of metal mines, there are often difficulties in the completion of recovery and the top of the filling, which leads to the emergence of local roof fall as well as the slice help. In this paper, we will do some research on the top fill filling scheme of horizontal stope filling.
作者
王超佩
张紫阳
WANG Chao-pei;ZHANG Zi-yang(Tibet huatailun Mining Development Co., Ltd., Tibet autonomous region, Lhasa 850200,Chin)
出处
《世界有色金属》
2018年第4期87-87,89,共2页
World Nonferrous Metals
关键词
水平分层
充填采矿法
采场接顶
充填方案
horizontal stratification, filling mining method, stope roof connection and filling scheme.