机电管线预制加工及物料追踪与BIM5D技术对接实践 被引量:3

下载PDF
导出
摘要 本文以商丘万达广场机电施工模型深化设计为例,详细介绍了项目机电管线预制加工及物料追踪的应用实践,针对机电施工模型深化设计,建立BIM5D云平台、线上实时展示预制构件等环节的深入研究,为同类工程施工提供借鉴。
出处 《安装》 2018年第5期57-60,共4页 INSTALLATION
  • 相关文献

参考文献3

二级参考文献54

  • 1Chuck Eastman, Paul Teicholz, Rafael Sacks,etc. BIM handbook: a guide to building information modeling for owners, managers,designers,engineers and contractors[M]. Second Edition. Hoboken,New Jersey,American & Canada :John Wiley & Sons, Inc, 2011.
  • 2Reza Ghassemi, Burcin Becerik-Gerber. Transitioning to integrated project delivery: potential barriers and lessons learned[J]. Lean Construction Journal 2011,2011:32-52.
  • 3Seongkyun Cho, Glenn Ballard.Last planner and integrated project delivery[J]. Lean Construction Journal 2011,2011: 67-78.
  • 4The Change Business Ltd.What is integrated project delivery^TM? [EB/OL]. http://www.thechangebusiness.co.uk/TCB/ Integrated_Project_Delivery_files/What -is -Integrated - Project-Delivery3.pdf.
  • 5Ryan E.Smith,Alan Mossman,Stephen Emmitt. Editorial lean and integrated project delivery [J]. Lean Construction Journal 2011,2011 : 1-16.
  • 6Yong-Woo Kim,Carrie Sturts Dossick.What makes the delivery of a project integrated?A case study of children's hospital,bellevue,WA[J].Lean Construction Journal 2011, 2011:53-66.
  • 72011LeanConstructionlnstitute.LCI Research [EB/OL].http: //www.leanconstruction.org/research.html.
  • 8Karen Wilhelm.Collaboration makes construction lean [J]. Target, 2007,23 (5) : 4-11.
  • 9David C Kent,Burcin Becerik Gerber.understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Research . 2010
  • 10F.Pena Mora,M.Li.Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Project. Journal of Construction Research . 2001

共引文献62

同被引文献12

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部