摘要
朝燕水库工程位于冷平河的一条二级小支流朝燕沟上,工程所在的朝燕沟流域无水文测站,无实测流量资料。设计采用水文比拟法(以弄金站为参证站)推求朝燕水库坝址径流。朝燕水库设计洪水由设计暴雨推求,并采用水文比拟法加以验证。
Zhaoyan Reservoir Project is located on Zhaoyan tributary, a small secondary branch river of LengpingRiver without hydrological station and flow data. With Nongjin Hydrological Station as reference station, the damsite runoff of this project was calculated by hydrological analogy method. The design flood was calculated with de-sign storm and checked by hydrological analogy method.
作者
梁雪容
LIANG Xue-rong(Guangxi Guiyu Engineering Consultant Co., Ltd., Nanning 530023, Chin)
出处
《广西水利水电》
2018年第2期15-18,22,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
径流
水文比拟法
设计暴雨
推理公式法
瞬时单位线法
Runoff
hydrological analogy method
design storm
rational formula method
instantaneous unit hydrograph method