期刊文献+

地铁车站机电工程综合支吊架系统现状问题分析 被引量:7

Analysis of current situation of comprehensive support and hanger system for electromechanical engineering in metro station
下载PDF
导出
摘要 地铁车站机电工程综合支吊架系统科学合理的实施,是地铁机电安装工程地下空间合理利用的关键。为了确保地铁工程的安全运营,从设计阶段和施工阶段2个方面对机电工程综合支吊架系统进行研究,提出相应的建议,以寻求设计和施工上的科学合理,确保机电工程综合支吊架系统的使用安全。 Scientific and well-arranged implementation of the integrated support and hanger system of the electromechanical engineering in metro station is a key to make underground space of metro mechanical and electrical installation works optimized. In order to ensure safe operation of the metro project, this paper studies the integrated support and hanger system of electromechanical engineering from two aspects of the design stage and the construction stage, and it puts forward some recommendations to fi nd scientifi c and reasonable design and construction solutions, and ensure safety of the integrated support and hanger system of electromechanical engineering.
作者 李虎军 Li Hujun
出处 《现代城市轨道交通》 2018年第5期45-47,共3页 Modern Urban Transit
关键词 地铁车站 机电工程 综合支吊架 安全分析 metro station electromechanical engineering integrated support and hanger safety analysis
  • 相关文献

同被引文献20

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部