2Mohle H.Improving the trough openings process at Premier Mine utilizing electronic delay detonators[A].Symposium Series S21(The South African Institute of Mining and Metallurgy):6th Int.Sym.For Rock Fragmentation By Blasting[C]. 1999:31-40.
3Preece D S, Chung S H.Development and application of a 3-D rock blast computer modeling capability using discrete elements-DMCBLAST-3D[A].Proc.of 27th Annual Conference on Explosive and Blasting Technique[C].2001(I).Orlando,Florida USA.11-18.
4Chadwick J.Positioning and communication[J].Mining Magazine.1999,180(3):150-157.
5Olsson M,Bergqvist I.Crack lengths from explosives in multiple hole blasting[A].Proc.5th Int.Symp.on Rock Fragmentation by Blasting[C].Rotterdam,Balkema.1996:191.
6Jose A.Sanchidrian,et al.On the use of rock constants in bench blast design methods[A].Proc.7th Int.Symp.on Rock Fragmentation by Blasting[C].2002:396-405.
8Harrod G R,Sahm W C.Mining information goes real-time[A].SME Annual General meeting[C].Orlando,Florida.1998:98.
9Lejuge G E,et al.Blast Damage Mechanisms in Open Cut Mining.Open Pit Mining Workshop,Perth[M].1994:96-103.
10Li U K,Ng S Y.Prediction of Blast Vibration and Current Practice of Measurement in Hong Kong[A].Proceedings of the Conference Asia Pacific-Quarrying the Rim[C].Hong Kong.1992:119.