摘要
公交场站服务水平与公交发展需求不相匹配已成为制约公交优先发展战略实施的因素之一。文中首先对公交场站的类别划分、功能定位及布局原则进行系统性概述。在此基础上,以武汉市公交系统为例,分析其公交发展现状,指出公交场站建设规划中存在的主要问题;其次,以定性和定量相结合的方法,预测近期武汉市公交场站需求;最后,提出武汉市公交场站布局方案。
It has become one of the factors restrict the implementation of transit-priority development strategy since the service level of public transportation station mismatches with the development demand of public transportation. This paper first gives a systematic summary of the classification,function orientation and layout principle of public transportation station,based on which,a case study of public transportation system in Wuhan is discussed,including the current development situation and the main problems in the construction and planning of public transportation. Secondly,the demand of public transportation station in Wuhan in the near future is predicted in combination of qualitative and quantitative ways. Finally,the layout scheme for public transportation station in Wuhan is proposed.
作者
严飞
常四铁
黄明亮
YAN Fei;CHANG Si-tie;HUANG Ming-liang(Wuhan Planning and Design Institute,Wuhan 430014,China)
出处
《物流工程与管理》
2018年第5期105-108,共4页
Logistics Engineering and Management
关键词
公交优先
公交场站
建设规划
布局方案
transit- priority
public transportation station
construction and planning
layout scheme