城市综合体项目的设计变更管理

Design Change Management of Urban Complex Project
下载PDF
导出
摘要 如何有效管理施工过程中的设计变更并保质保量地完成施工任务,一直是施工单位所关注的问题。在虹源盛世国际文化城项目施工过程中,由于设计院自身原因、建设单位对建筑功能修改、招投标进度滞后、设计分包过多且无专人协调管理及其他原因,导致出现了大量的设计变更。如何有效管理设计变更并保质保量完成施工任务,是施工单位需要探讨的问题。只有通过控制施工过程中设计变更的产生、做好设计变更文件的收发管理、及时做好索赔手续、及时做好施工图纸的更新等手段来管理设计变更,确保项目顺利推进。 How to effectively manage the design change in the construction process and to complete the construction tasks in the quality and quantity guarantee are always the issues for attention by the construction units. In the construction process of Hongyuan Prime International Cultural City Project, a large number of design changes have occurred due to the reasons of design institute itself, the modification of construction function by construction unit, the delay of bidding schedule, the excessive design subcontract and no person coordinated management and other reasons. How to effectively manage the design change in the construction process and to complete the construction tasks in the quality and quantity guarantee are the issues required for the construction units to discuss. Only by controlling the design change in the construction process, doing the receive management of design change documents well, timely completing the claims procedure and accomplishing the renewal of construction drawing in time to manage the design changes can the projects be ensured to smoothly implement.
作者 周均立 郑杰
出处 《城市道桥与防洪》 2018年第5期254-256,共3页 Urban Roads Bridges & Flood Control
关键词 城市综合体 设计变更 管理 urban complex design changes management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部