摘要
本研究以中铁上海局承建的上海白龙港污水处理厂扩建二期工程W2.3标为例,着重介绍了大型污水泵站圆形地连墙、无内支撑逆作内衬施工技术、基坑监控量测、污水泵站超长内衬防水技术,以为保障无内支撑两墙合一逆作法的施工质量提供借鉴和参考。
This study takes the W2.3 section of the second phase of the extension project of Shanghai Bailong port sewage treatment plant built by the CREC Shanghai Group as an example, it emphatically introduces the round connecting wall of large sewage pumping station, construction technology of inner lining without internal support, foundation pit monitoring measurement, and the waterproof technology of super long liner in sewage pumping station, so as to provide reference for ensuring the construction quality of the reversed construction method of dual-purpose diaphragm wall without internal support.
作者
曹国安
CAO Guo-an(Municipal Engineering Co.Ltd.ofCREC Shanghai Group, Shanghai 200000, Chin)
出处
《中小企业管理与科技》
2018年第14期134-135,共2页
Management & Technology of SME
关键词
逆作法
内支撑
深基坑
reversed constructionmethod
internal support
deep foundationpit