摘要
轨道交通工程技术复杂、涉及众多系统,系统之间都存在着大量技术接口关系,特别是电气专业基本上与每一专业都存在接口关系。由于大量接口的存在,很容易造成专业设计遗漏及功能的缺失。文章结合福州市轨道交通1号线施工及调试的经验,主要分析了电气专业和相关专业的若干接口问题和解决方案。
Rail traffic engineering technologyis complex,involving many systems. There are a large number of technical interfaces between different systems. In particular,electrical major almost has interface with every major. Due to the existence of a large number of interfaces,it is easy to miss to cause malfunction while designing. Based on the experience of construction and system test of Line 1,this paper mainly analyzes some interface problems and solutions of electrical major and related majors.
作者
何俊伟
HE Junwei(Fuzhou Metro Group Corporation Limited, Fuzhou 35000)
出处
《福建建筑》
2018年第4期95-98,共4页
Fujian Architecture & Construction