地铁换乘站深基坑突水处理关键技术

Key treatment technology of water inrush in deep foundation pit of metro transfer station
下载PDF
导出
摘要 深基坑突水一直是工程施工中的重大安全隐患,如何准确判断突水原因、突水来源是解决及控制突水灾害的关键。本文以深圳地铁5号、9号线换乘站深基坑突水事件为背景,从地层条件、周边环境探讨了基坑突水成因,提出在人工湖影响下基坑突水应急处理措施,通过突水源头治理、突水通道截断、突水位置堵漏三步处理工序,有效控制及避免突水情况的进一步恶化。 Water inrush in deep foundation pit has always been a major safety hazard in engineering construction. How to accurately determine the causes of water inrush and the source of water inrush is the key to the solution and control of water inrush. In the background of the water inrush event in the foundation pit of the transfer station of line 5 and 9 of Shenzhen metro,the causes of water inrush from perspective of the stratum condition and the surrounding environment were discussed,and the emergency treatment measures for water inrush in foundation pit under the influence of artificial lake were put forward. Through three-step processing procedure including the water inrush source control,the water inrush channel truncation and the water inrush position plugging,further deterioration of water inrush condition was effectively controlled and avoided
作者 毛新颖 刘斌 冯兴仁 陈保国 佘明康 Mao Xinyin1;Liu Bin2;Feng Xingren2;Chen Baoguo1;She Mingkang1(1. (Wuhan) School of Engineering, China University of C, eosciences, Wuhan 430074; 2. Sinohydro Bureau 7 Co. , Ltd. , Chengdu 610081)
出处 《工程建设》 2018年第4期45-48,共4页 Engineering Construction
基金 国家自然科学基金(41602319) 中国水利水电第七工程局有限公司科研基金(2017056007)
关键词 深基坑 突水 人工湖 处理措施 deep foundation pit water inrush artificial lake treatment measures
  • 相关文献

参考文献6

二级参考文献39

共引文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部