摘要 针对超大超深基坑降水水位在-30^-40m时,地下水补给性强,导致管井降水效果不理想、成本递增的情况,以沈阳某深基坑降水工程实例作为实践对象,介绍了二级接力降水施工技术的工艺原理及实践效果。结果表明:该基坑采用"坑中坑"二级接力降水方案是可行的,相较于传统基坑外一级降水工艺,二级接力降水工艺加快了施工进度、提高了降水效果、节约了降水成本。 In the large and deep foundation excavation,when the precipitation water level is between-30 --40 m,the groundwater recharge is strong,which can result in undesirable dewatering effect of tube well and cost increase. According to this situation,taking a foundation excavation in Shengyang for example,this paper introduces the technology principle and practice effect of secondary relayed dewatering construction technology. The results show that pit-in-pit secondary relayed dewatering technology is practicable in the foundation excavation,and it has more advantages than conventional onestage dewatering technology in accelerating construction progress,improving effect of dewatering and saving cost of dewatering.
作者 毛旭 王巧南 张立国 林成栋 宋超 MAO Xu, WANG Qiaonan, ZHANG Liguo, LIN Chengdong, SONG Chao(China Construction Eighth Engineering Co. , Ltd. , Dalian Branch, Dalian, Liaoning 116021, Chin)
出处 《施工技术》 CAS 2018年第9期11-13,83,共4页 Construction Technology
关键词 深基坑 坑中坑 二级接力降水 施工技术 应用 deep foundation excavation pit-in-pit secondary relayed dewatering construction application
  • 相关文献

参考文献4

二级参考文献22

共引文献10

同被引文献54

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部