35kV城马线停电全线登杆检修作业探究 被引量:1

Investigation of Pole Climbing Overhaul Operation on Full line of 35kV Chengma Line
下载PDF
导出
摘要 为了确保35kV城马线路的安全运行,提高县城区供电可靠性,提出检修作业方案措施。首先从组织措施入手分析,阐述了城马线停电全线登杆检修作业技术措施;然后提出停电检修安全措施及安全风险预测,以期为相关人员提高应急处置能力提供一定的帮助。 In order to improve the safe operation of 35kV Chengma Line and improve the reliability of power supply in the county area, measures of overhauling operation were proposed. First of all, the technical measures of pole climbing overhaul operation was introduced based on the organizational measures. The safety measures of power outage overhaul and forecast of safety risk were proposed to provide some help for the related personnel to improve their capability of dealing with emergency.
作者 陈聪 CHEN Cong(Long Lin Power Supply Co. , Ltd. , Baise 533000, Chin)
出处 《电工技术》 2018年第7期128-129,共2页 Electric Engineering
关键词 检修作业 停电检修 安全风险 overhaul operation outage maintenance safety risk
  • 相关文献

参考文献3

二级参考文献8

共引文献4

同被引文献13

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部