期刊文献+

大跨度钢管拱桥顶推施工技术 被引量:2

Incremental Launching Technique for Long-span Steel Pipe Arch Bridges
下载PDF
导出
摘要 当桥梁跨越不可间断的运输线(铁路、公路、河道等),由于交通线路运营繁忙或场地限制,其它施工方法无法满足要求时,采用顶推法或转体法施工从空中完成跨越作业,无疑是一种比较理想的方法。大跨度钢管拱桥顶推施工,通过滑块限位、导向纠偏装置、顶推千斤顶顶力纠偏方式,分段施工,减少了顶推重量,缩短了顶推段现浇梁占用相邻现浇段时间,即解决了跨度大的难题,又减小了顶推重量,缩短了工期。 When bridges span unbroken transportation lines( railways,highways,river channels,etc.),due to the busy traffic lines or site restrictions,many construction methods can not meet the requirements,it is undoubtedly an ideal method to perform a spanning from the air by using incremental launching method or swivel-type method. The incremental launching technology for long-span steel pipe arch bridges is a method that uses spacing sliding block,guiding correction device and jack to correct the errors.This is a segmental construction technology,which reduces the push weight and shortens the push segment time of adjacent cast-in-place occupied by cast-in-situ beams. It not only solves the problem of long span,but also reduces the push weight,shortening the construction period.
作者 刘瑞 LIU Rui(The 5th Engineering Co., Ltd., China Railway 18th Bureau Group,Tianjin 300350, China)
出处 《长春大学学报》 2018年第4期7-11,共5页 Journal of Changchun University
关键词 大跨度 顶推 技术 long span incremental launching technology
  • 相关文献

参考文献1

二级参考文献5

共引文献2

同被引文献2

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部