高坝洲电厂受油器密封选择计算

Seal Selection for the Unit Oil Supply Head in Gaobazhou Hydropower Station
下载PDF
导出
摘要 针对高坝洲电厂轴流转浆式机组受油器密封设计进行了探讨,按国家标准中O型密封圈沟槽尺寸设计要求,采用相关公式对高坝洲电厂受油器密封的尺寸大小进行了计算分析,证明了高坝洲电厂是由于密封尺寸选择不合适而产生了受油器漏油问题。 The selection of the seal for the oil supply head of Kaplan turbine units in Gaobazhou Hydropower Station is introduced. Following the national standard on the O-type sealing ring groove size,the size of the oil supply head seal is calculated for the units. It is found that the oil leakage problem occurred in the oil supply head in Gaobazhou Hydropower Station is due to the inappropriate seal size selected originally.
作者 张晋境 江旭 傅超 ZHANG Jinjing;JIANG Xu;FU Chao(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,Chin)
出处 《水电与新能源》 2018年第5期58-60,共3页 Hydropower and New Energy
关键词 轴流转浆式机组 高坝洲电厂 受油器 密封选择计算 Kaplan turbine unit Gaobazhou Hydropower Station oil supply head seal selection
  • 相关文献

参考文献3

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部