预制板桩在湖岸挡墙中的应用 被引量:1

Application of prefabricated slab pile in the lake shore retaining wall
下载PDF
导出
摘要 本文通过工程实例介绍了预制板桩在湖岸挡墙中的应用,论述了预制板桩应用于湖岸挡墙的优越性。同时采用数值模拟分析软件,对湖体开挖工况进行模拟,通过模拟明确了湖体开挖过程中预制板桩支护体系的受力及位移情况。项目实施后经施工监测表明,采用预制板桩作为湖岸挡墙即能满足安全要求,又能有效节约造价和工期,为类似工程项目提供了良好的借鉴。 This paper introduced the application of prefabricated slab pile in the lake shore retaining wall through an engineering example,discussed the advantages of prefabricated slab pile for lake shore retaining wall. At the same time the numerical simulation analysis software was used to simulate the excavation conditions of the lake,so the stress and displacement of supporting system in the process of the lake body excavation was acquired. After project implementation,the construction monitoring showed that the slab pile retaining wall can satisfy the security requirements,as while as can effectively save cost and time limit for a project,provides a good reference for similar engineering projects.
作者 林雪梅
出处 《福建建设科技》 2018年第3期67-68,77,共3页 Fujian Construction Science & Technology
关键词 预制板桩 湖岸挡墙 数值分析 Prefabricated slab pile Lake shore retaining wall Numerical analysis
  • 相关文献

参考文献1

二级参考文献2

  • 1余志成;施文华.深基坑支护设计与施工[M]{H}北京:中国建筑工业出版社,1997.
  • 2尉希成;周美玲.支挡结构设计手册[M]{H}北京:中国建筑工业出版社,2004.

共引文献6

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部