摘要
为解决城市高架快速路一落地就堵的问题,结合武汉市姑嫂树路高架终点接线方案设计,采用分析评价的方法,总结高架桥落地后交通疏解的一些方法和思路,以期为同类工程提供参考。
In order to solve the problem of city elevated expressway blocking oncegrounding ,combined with the design of wuhan city gusaoshu road elevated end connection scheme,methods usedby the analysis evaluation,summarized some methods and ideas for the viaduct after landing of trafficorganization,in order to provide reference for similar projects.
作者
赵彬强
程林
ZHAO Binqiang;CHENG Lin(Wuhan Municipal Engi.Design&Research Institute Co., Ltd., Wuhan 430023, China;Jingmen Municipal Government Investment Project Construction Management Center, Hubei Jingmen 448000, China)
出处
《低温建筑技术》
2018年第5期19-20,40,共3页
Low Temperature Architecture Technology
关键词
高架快速路
接地
主线高架
匝道
elevated expressway
grounding
the main line viaduct
ramp