摘要
在薄煤层综采工作面切眼巷设计时直接将支架降到煤层高度,将支架顶梁前部分完全伸入煤层支撑接顶,将底座放在切眼巷后部起支撑作用,就有了在切眼巷布置前、后腰巷的设计。采煤机割煤过后通过及时拉架便可完全控制顶板冒落,解决了回采初期顶板管理困难的问题,经济效益显著。
The layout of front and back lane is applied to open-off cut design by reducing the support to the height of the coal seam, stretching the front section of roof beam into coal seam to leg up and laying the base at the back of open-off cut, which can solve the roof management difficulties in early stage of recovery by dragging the erection to control roof falling.
作者
董文龙
Dong Wenlong(Nanzhuang Co., Nanzhuang Coal Group Co., Ltd., Yangquan, Shanxi, 04500)
出处
《江西煤炭科技》
2018年第2期35-37,共3页
Jiangxi Coal Science & Technology
关键词
综采工作面
薄煤层
工作面切眼
fully-mechanized working face
thin coal seam
open-off cut