摘要
以湖北咸宁国家高新技术产业开发区为对象,对分布式能源系统在园区中的应用进行了分析与研究,并对园区各企事业单位的蒸汽及电力需求进行统计分析后,提供了2种能源站装机比选方案。同时分析了投产期2种方案的能耗对比,以及影响项目经济指标的敏感性因素,并提出了改善项目经济性的参考建议。
The application of combined heat and power(CHP)technology in the industrial park in Xianning National High-Tech Industrial Development Zone of Hubei Province is analyzedand studied. After statistical analysis of the steam and electricity de-mand of all enterprises and institutions in the park, two proposals ofenergy station configuration are provided and compared. At the sametime, the impact of energy consumption during the commissioningperiod in the area is analyzed, as well as the sensitivity factors thataffect the economic indicators of the project. Suggestions for improv-ing the economy of the project are put forward.
作者
黄敏轩
HUANG Min-xuan(CITIC General Institute of Architectural Design and Research Co., Ltd.,Wuhan 430014,China)
出处
《电力需求侧管理》
2018年第3期40-42,50,共4页
Power Demand Side Management