摘要
本文通过煤矿掘进工作面在巷道掘进的过程中经常揭露断层、地质构造破碎带现象,讨论了过断层的方法及措施,对巷道掘进过程中安全通过断层,加快施工速度有现实指导意义。
By a discussion of the revealed fault and tectonic fracture zone happened in the process of drivage in coal mine tunneling faces, the paper discusses the methods and measures of fault-crossing, which accelerates the construction speed, and has provide practical guiding significance.for the security in the process of drivage through fault.
作者
李强
Li Qiang(Gaoyang Coal Mine, Fenxi Mining Industry, Shanxi Xiaoyi 03230)
出处
《山东煤炭科技》
2018年第5期79-80,共2页
Shandong Coal Science and Technology
关键词
断层
地质构造破碎带
技术措施
fault fracture zone of geological structure technical measures